Military Site Road Transition Construction
It was built for Denizli Municipality. 3 lane departures - 3 lanes arrivals There are main productions made for road construction with a length of 2,800 m.
- Open water channels on either side of the road
- Rainwater culverts and ducts
- 1.000mm diameter 3.000m long rainwater drainage pipe
- One tank bridge bridge
- One pedestrian overpass
- Retaining walls along 4-8m high road
- Creek reclamation
- Flood protection bases
- Dry pere - mortar pere
- 600.000 m³ consumption
- 300.000m³ fill
- 145.000 tons of basic and sub base material